Remote MCP · Endpoint
Energy Projects AU Commercial Solar Assessment MCP server
No. Energy Projects AU Commercial Solar Assessment answered an MCP handshake 57 minutes ago.
UpLast checked 57 minutes ago
Server URL
https://energy-projects.com.au/mcp
The last check completed an MCP handshake.
- Registry name
- io.github.EnergyprojectsNZ/commercial-solar-assessment
- Transport
- Streamable HTTP
- Protocol negotiated
- 2025-06-18
- Handshake latency
- 953 ms
- Tools exposed
- 1 tool
- Uptime, last 30 days
- 100% from 14 checks
- Described by its publisher as
- Indicative commercial rooftop solar assessments for Australian buildings, from open map data.
- Listing
- From the official MCP registry (active).
| Checked | Result | Handshake |
|---|---|---|
| 57 minutes ago | Handshake completed | 953 ms |
| 3 days ago | Handshake completed | 161 ms |
| 12 days ago | Handshake completed | 1.04 s |
| 13 days ago | Handshake completed | 282 ms |
| 15 days ago | Handshake completed | 187 ms |
| 15 days ago | Handshake completed | 1.56 s |
| 17 days ago | Handshake completed | 137 ms |
| 18 days ago | Handshake completed | 126 ms |
| 18 days ago | Handshake completed | 927 ms |
| 20 days ago | Handshake completed | 104 ms |
| 22 days ago | Handshake completed | 130 ms |
| 25 days ago | Handshake completed | 728 ms |
| 27 days ago | Handshake completed | 695 ms |
| 29 days ago | Handshake completed | 855 ms |
The last 14 checks. Full history is kept for 30 days; the all-time counter stands at 30 responding of 30.
How to read this
- ·Handshake latency is one measurement from one probe, from our infrastructure. It is a smoke signal about the endpoint, not a benchmark of your own connection to it.
- ·An authentication challenge counts as responding. A hosted server that refuses an anonymous prober is behaving correctly.
- ·A tool count of “behind credentials” means the handshake worked but listing tools needed a token we do not hold.
- ·Uptime covers the last 30 days of our own checks, at most one an hour, and says how many checks it is drawn from.
Listing data comes from the official MCP registry. Glide is not affiliated with Energy Projects AU Commercial Solar Assessment and makes no claim about it beyond what these checks measured.