Italy
IBSPIT2F092 — Cassa Dei Risparmi Di Forli' E Della Romagna Spa
IBSPIT2F092 is a SWIFT/BIC code for CASSA DEI RISPARMI DI FORLI' E DELLA ROMAGNA SPA ((HEAD OFFICE)) in FORLI'. Use it when an international wire needs the receiving bank's SWIFT code.
Wiring to Cassa Dei Risparmi Di Forli' E Della Romagna Spa? Check the rate and the fee side by side first. Compare wire costs →
SWIFT / BIC code
IBSPIT2F092
IBSPIT2F092 breaks down as IBSP for bank, IT for ctry, 2F for city, 092 for branch.
(HEAD OFFICE) · FORLI' · Italy
Bank information
- SWIFT / BIC
- IBSPIT2F092
- Branch
- (HEAD OFFICE)
- City
- FORLI'
- Country
- Italy
Other Cassa Dei Risparmi Di Forli' E Della Romagna Spa codes24
| SWIFT / BIC | Branch |
|---|---|
| IBSPIT2F006 | (FILIALE IMPRESE BAGNACAVALLO) |
| IBSPIT2F063 | (RIMINI - PIAZZA FERRARI 7) |
| IBSPIT2F092 | (FILIALE IMPRESE FORLI' - VIA G.REGNOLI) |
| IBSPIT2F150 | (FILIALE IMPRESE RAVENNA) |
| IBSPIT2F300 | (FILIALE IMPRESE) |
| IBSPIT2F478 | (FILIALE IMPRESE CESENA) |
| IBSPIT2F637 | (RAVENNA - PIAZZA XX SETTEMBRE 7) |
| IBSPIT2F647 | (FORLI' - PIAZZA SAFFI 33) |
| IBSPIT2F650 | (BACKOFFICE IMPRESE) |
| IBSPIT2F652 | (FAENZA - VIA NAVIGLIO 18/20) |
| IBSPIT2F782 | (DC SO BACK OFFICE DI RETE) |
| IBSPIT2F789 | (BACK OFFICE RETE TREVISO) |
| IBSPIT2F895 | (DC OP FLUSSI REMOTE ESTERI ) |
| IBSPIT2F896 | (DC OP CORPORATE ESTERO COMO) |
| IBSPIT2F897 | (DC OP CORPORATE ESRERO FIRENZE) |
| IBSPIT2FB12 | (DC OP FLUSSI REMOTE DOMESTICI) |
| IBSPIT2FB77 | (DC OR BACK OFFICE TORINO) |
| IBSPIT2FB99 | (ADMINISTRATIVE UNIT OF FORMERLY I.M.I.) |
| IBSPIT2FCMU | (C.M. SERVICES UNIT) |
| IBSPIT2FF87 | (DC OR BACK OFFICE TORINO DESK CORPORATE) |
| IBSPIT2FK30 | (BACK OFFICE FIRENZE) |
| IBSPIT2FK45 | (DC OR BACK OFFICE BERGAMO) |
| IBSPIT2FK83 | (BACK OFFICE DI RETE DI FORLI) |
| IBSPIT2FK99 | (DC OR BO ESTERO E DESK CORPORATE) |
International payments
Sending money to Cassa Dei Risparmi Di Forli' E Della Romagna Spa?
A correspondent wire picks up a fee at each bank it passes through, and most of its real cost is buried in the exchange rate. Conversions are quoted at the mid-market rate, with the cost charged as a visible fee rather than buried in the rate.